Mardie Salt – Primary Seawater Intake Facility

Mardie, WA

INFO

Client:

BCI Minerals / Ertech

The Mardie Salt & Potash Project is situated on the picturesque Pilbara coast of Western Australia. EIG had the pleasure of spearheading the design and construction of the Seawater Intake Pumping Infrastructure, which is capable of pumping an impressive 160GL of seawater annually.

Our scope of work encompassed a wide range of essential components, including Power Generation, Switchrooms, Cable Reticulation, Area Lighting, Earthing, Lightning Protection, and Bulk Fuel Infrastructure. To ensure optimal performance, our team conducted rigorous testing and commissioning procedures.

At EIG, we take pride in delivering high-quality solutions that exceed our clients’ expectations. Our team of experts utilized their extensive knowledge and cutting-edge technologies to ensure that the Seawater Intake Pumping Infrastructure is designed and constructed to the highest standards. We are confident that our solution will provide the reliability and longevity required for the Mardie Salt & Potash Project to succeed.

CLOSE
Burgundy Diamond Mine Exploration Plant

West Kimberley, WA

INFO

Client:

Burgundy Diamond Mines

At EIG Australia, we are proud to have been appointed by Burgundy Diamond Mines as the principle contractor to undertake the construction, and commissioning of their new Exploration Plant. Located on the site of the previously operational Ellendale Diamond Mine, this state-of-the-art Stark Resources facility is set to revolutionize small-scale diamond mining. Our team of experts has carried out a range of tasks, including Perth-based plant inspection, electrical and mechanical installations, and plant process commissioning. We are confident that the Exploration Plant, which features a Tomra processing plant, four material conveyors, feed bin, screen, and a water treatment plant, will operate seamlessly and efficiently, delivering exceptional results for Burgundy Diamond Mines for years to come.

CLOSE
Christmas Creek Village, High Voltage Upgrade

Pilbara, Western Australia

INFO

Client:

RED/FMG

EIG safely completed the transition to high voltage services at Christmas Creek Village. The completion of the high voltage upgrade consisted of the installation of two new 33KV substations, together with associated LV works.

CLOSE
Eramurra Village

Karratha, Western Australia

INFO

Client:

Resource Engineer and Design / Citi Pacific

This project consisted of the installation of a 33KV high voltage transformer together with a 1600 amp main site switchboard.

CLOSE
FMG, Karntama Accommodation Village, Backup Power Generation

Pilbara, Western Australia

INFO

Client:

RED/FMG

EIG was contracted to install a new 5000A switch room together with three backup generators. This new facility feeds a high voltage 11KV step-up transformer which provides power to the village in the event of a power outage.

CLOSE
More Mining & Industrial Projects
INFO

Client:

Rio Tinto, Tier 16, Decmil

M1 RES DEV 66KVA Standby Power Generation
Koodaideri Mine Site, Newman WA
Client: Rio Tinto

Nammuldi Fixed Plant Air Manifolds
Nammuldi WA
Client: Tier 16 / Rio Tinto

LV And MEM Workshop Expansion
West Angelas Approx. 100km north of Newman
Client: Decmil / Rio Tinto

SB25 Infrastructural Power Upgrade
West Angelas, Newman WA
Client: Decmil / Rio Tinto

 

 

CLOSE