MRL Kens Bore Aviation

Onslow, Kens Bore

INFO

Client:

Mineral Resources Limited

In 2024 EIG Australia completed the supply and installation of a 55kL aviation fuel farm facility for Mineral Resources Limited at their Kens Bore mine site. The project was part of the new Ken’s Bore Resort Construction Project and was situated directly next to the new terminal building, with above and underground pipework spanning 200m from the fuel farm to the airfield. EIG worked closely with MRL and Viva to deliver a quality facility that complied with Australian, MRL, Viva and JIG standards and provided a number of cost and time saving opportunities. This was especially crucial as the installation of the aviation facility opened up avenues for MRL to fast-track the launch of their dedicated charter flight service MinsRes Air.

CLOSE
LENS AB Fuel Facility

Brockman 2, WA

INFO

Client:

Rio Tinto / Formstruct

EIG Australia was commissioned to oversee the comprehensive design and construction of the impressive 400KL Bulk Fuel Facility, which encompassed the fabrication, installation, and commissioning of Rio Tinto’s Lens AB Fuel Hub. In addition to this fuel facility, EIG undertook the construction of all services pertaining to the Non Processed Infrastructure (NPI). This encompassed a wide range of services, including the installation of site switchboards, lighting towers, building services, compressed air systems, oily water systems, and various other essential components

CLOSE
Western Turner Syncline 2

Western Syncline 2, WA

INFO

Client:

Rio Tinto / Georgiou Group

As part of our extensive scope of work, we successfully designed and constructed six Bulk Lube Hose Reel Gantries, equipped with the capability to dispense up to 14 different types of lubrication products each. These cutting-edge gantries were strategically installed in both the HME Workshop and the LME Workshop, facilitating optimal efficiency within the facility. Additionally, we installed an impressive 2 kilometers of Code 61 hydraulic I6 Spec Stainless Steel piping, ensuring the entire infrastructure of the facility met stringent quality standards.

In addition to the gantries and piping, EIG also provided a transportable bulk lube sea container, specifically designed to dispense lubrication products in remote field locations. This container serves as a convenient and reliable solution for lubrication needs in challenging environments.

CLOSE
Silvergrass 1ML Fuel Farm

Greater Brockman, WA

INFO

Client:

Australian Defence Force / Duratec Limited

EIG delivered the mechanical construction along with the electrical design and commissioning assurance of a major diesel filtration facility on Garden Island. This facility is capable of filtering 1200L/minute of Diesel fuel and is comprised of two high volume pre-filtration vessels, six high volume coalesces and filtration vessels.

Despite the perceived difficulties that the client foresaw EIG would encounter in delivering the complex and critically important project, EIG completed the project ahead of an already advanced schedule.

CLOSE
FMG Tug Boat Harbour

Port Hedland, WA

INFO

Client:

Decmil / Besix Joint Venture

Designed, constructed and commissioned by EIG, the FMG Tug Boat Harbour fuel system includes a 200kl self-bunded storage tank with a custom-built offshore refuelling container, that has 800m of above / belowground piping which employs a state-of-the-art leak detection system, Mining / Marine grade MCC housing multiple Variable Speed Drive’s, PLC, Network Equipment and other pertinent process control infrastructure. The harbour also utilises a TubePress piping system throughout.

EIG also designed and supplied a remote fibre optic network to mitigate any safety concerns and send such signals over long distances.

CLOSE
Nammuldi Central Mine Services – Bulk Lube Facility For HME & LV Workshops
INFO
CLOSE
55KL Fuel System

Koodaideri Mine Site, Newman WA

INFO

Client:

Rio Tinto

EIG completed the demolition of a non-compliant fuel delivery system and the design and installation of a new larger capacity and fully compliant bulk storage and fuel delivery system.

This fuel delivery system provides diesel fuel for eight generators, which powers Koodaideri Village, the accommodation on site.

EIG provided the client with a fully automated fuel delivery system and lessened the need for manual inventory checking and refuelling.

CLOSE
More Hydrocarbon Projects
INFO

Client:

Rio Tinto, Fuel Fix, BHP Billiton, Decmil, FMG, RC Civil, Newmont Mining

110KL Light Vehicle (LV) Fuel Facility & Electrical Works
Koodaideri Mine Site, Newman WA | Client: Rio Tinto

5KL Waste Water Treatment Plant – Fuel Facility
Koodaideri Mine Site, Newman WA | Client: Rio Tinto

Mega Tanks Clean Fuel
Nelson Point Mine, Port Headland, WA | Client: Fuel Fix/BHP Billiton

Boodarie
Boodarie Rail Facility, Port Headland, WA | Client: BHP Billiton

High Flow Diesel Dispensing System
Mining Area C (MAC), Pilbara, WA | Client: BHP Billiton

West Angelas Mine Site – Heavy Vehicle Refuel Facility
West Angelas Approx. 100km North of Newman | Client: Decmil / Rio Tinto

Solomon
Pilbara | Client: Fuel Fix / FMG

Chichester Rail Diesel Off Load Facility
Pilbara, Western Australia | Client: Fuel Fix/FMG

Boddington Gold Mine
Boddington | Client: RC Civil/Newmont Mining

CLOSE
Oxley Wharf Extension

Garden Island, WA

INFO

Client:

Australia Defence Force / Duratec Limited

Project NCIS-4B Oxley Wharf Extension significantly upgraded the fuel service infrastructure at HMAS Stirling, Western Australia. The upgrades included extending the AVCAT, Quarantine, and OFI pipelines. The AVCAT system now seamlessly integrates with existing pipelines at Parkes and Diamantina Wharves, with new refuelling and defuelling points increasing operational efficiency. The Quarantine and OFI pipelines are also fully integrated, featuring advanced control valves and monitoring systems within the SCADA system. These enhancements ensure the facilities are fit for purpose and support the transition from ANZAC frigates to HCF, positioning HMAS Stirling to meet future naval demands effectively.

CLOSE
F44 Fuel Upgrade

Garden Island, WA

INFO

Client:

Australia Defence Force / Duratec Limited

EIG Australia was contracted to carry out a major fuel facility upgrade for F44 aviation fuel (JP-5). This project involved upgrading all fuel pumps, fuel piping, and over-water wharf fuel coping points, in addition to the supply and installation of new tanks.

One of the most complex aspects of the project was the complete new installation of the electrical PLC/SCADA CITEC system. Our team of experts worked diligently to ensure that the new system was installed seamlessly, with minimal disruption to the existing system.

We also installed hundreds of meters of underground piping with cathodic protection to ensure that the entire fuel facility was operating safely and efficiently. The upgrade of high volume filter coalescers was another crucial component of the project that we executed with precision.

Throughout the project, we worked closely with the Australian Defence Force to ensure that all work was completed to their satisfaction. We conducted thorough testing and commissioning of the entire fuel facility to guarantee optimal performance.

Our team of specialists managed to complete the project within the specified timeframe and budget, despite the complexity of the work involved. We were proud to have provided the Australian Defence Force with a fuel facility that meets the highest safety and efficiency standards.

CLOSE
OFI Filter House — Major Diesel Filtration Facility

Garden Island, WA

INFO

Client:

Australian Defence Force / Duratec Limited

EIG delivered the mechanical construction along with the electrical design, and commissioning assurance of a major diesel filtration facility on Garden Island. This facility is capable of filtering 1200L/minute of Diesel fuel and was comprised of two high volume pre-filtration vessels, six high volume coalesces and filtration vessels.

Despite the perceived difficulties that the client foresaw EIG would encounter in delivering the complex and critically important project, EIG completed the project ahead of an already advanced schedule.

CLOSE
RAAF Pearce Electrical Works (CEPS)

Bullsbrook & Gingin, WA

INFO

Client:

Australian Defence Force / Duratec Limited

EIG completed the upgrade of the central emergency power station. This included the installation of a new back-up power station, with HV generators, fuel system, HV panels and control system. All systems were fully integrated into the active site.

EIG were engaged as integration specialists and were able to reduce client costs, allowing budget reallocation to complete further upgrades to systems in other areas.The additional funds allowed for HV cable upgrades as RAAF Pearce and an upgrade to the load bank and a new smart battery backup for the power station at RAAF Gingin.

EIG completed the high-risk work and minimised the impact on site operations, all whilst completing a planned stage cutover into an active site.

CLOSE
Hazardous Areas Compliance

HMAS Stirling, Garden Island WA & RAAF Pearce, Bullsbrook WA

INFO

Client:

Australian Defence Force / Duratec Limited

EIG were engaged to inspect, design and rectify electrical installations across multiple Australian Defence Force sites. This included detailed grade inspections of existing explosion protected equipment within hazardous areas, compilation of inspection reports and surveys noting any non-conformances.

EIG replaced multiple systems including hazardous compliant control systems, fire systems, distribution boards, lighting, power and earthing systems. Hazardous Area Verification Dossiers were then created for all hazardous areas.

Our specialist team were able to quickly adapt to all the individual requirements they were confronted with when working in such niche and high-risk environments.

Working closely together with the client, EIG Australia helped in achieving substantial cost-savings by adjusting both the types of hazardous substances being utilised and how they are stored. These changes resulted in greatly reduced outlay costs, future maintenance expenses, and most importantly the reduced size of the overall hazardous area footprint on the defence bases.

CLOSE
Campbell Barracks Light Vehicle Workshop

Swanbourne, WA

INFO

Client:

Australian Defence Force / Duratec Limited

EIG designed and constructed a complete lubrication facility for the light vehicle workshop at Campbell Barracks. This consisted of the entire design and construction of the mechanical and electrical systems, including code 61 high pressure stainless steel piping for six lubricants and coolants. The hose reel racks were in groups of six on custom built racks in four locations.

EIG designed the custom lubrication dispensing and storage system to the client’s specifications, and installed the system within a sea container module, allowing the client to re-locate the facility to a new location if necessary.

CLOSE
Small Boat Harbour – Mechanical And Electrical Overhaul Of Pumping/Filtration Unit

Garden Island, WA

INFO

Client:

Australian Defence Force / Duratec Limited

EIG completed the electrical and mechanical design and construction of both the mechanical and electrical overhaul of the Moresby Wharf refuelling and filtration facility.

The project consisted of the demolition of the existing facility, and the enhanced design and construction of a new diesel refuelling facility and two large coalesces.

EIG utilised contemporary mechanical equipment and electrical systems. This provided improved safety, advanced instrumentation, and smoother operational procedures.

CLOSE
More Defence Projects
INFO

Client:

Australian Defence Force / Duratec Limited

Pearce Aircraft Control Tower – Lightning Protection & Aircraft Obstacle Lighting
RAAF Pearce, Bullsbrook WA | Client: Australian Defence Force / Duratec Limited

AVCAT Tank Bund Remediation
Garden Island, WA | Client: Australian Defence Force / Duratec Limited

RAAF Gingin Transmitter Building
RAAF Gingin, Gingin WA | Client: Australian Defence Force / Duratec Limited

RCD Compliance
Various Sites, WA | Client: Australian Defence Force / Duratec Limited

Lancelin Firing Point Alpha
Lancelin, WA | Client: Australian Defence Force / Duratec Limited

HMAS Stirling Hardstand
Garden Island, WA | Client: Australian Defence Force / Duratec Limited

Electrical Sewer Upgrades
RAAF Pearce, Bullsbrook WA | Client: Australian Defence Force / Duratec Limited

CLOSE
Mardie Salt – Primary Seawater Intake Facility

Mardie, WA

INFO

Client:

BCI Minerals / Ertech

The Mardie Salt & Potash Project is situated on the picturesque Pilbara coast of Western Australia. EIG had the pleasure of spearheading the design and construction of the Seawater Intake Pumping Infrastructure, which is capable of pumping an impressive 160GL of seawater annually.

Our scope of work encompassed a wide range of essential components, including Power Generation, Switchrooms, Cable Reticulation, Area Lighting, Earthing, Lightning Protection, and Bulk Fuel Infrastructure. To ensure optimal performance, our team conducted rigorous testing and commissioning procedures.

At EIG, we take pride in delivering high-quality solutions that exceed our clients’ expectations. Our team of experts utilized their extensive knowledge and cutting-edge technologies to ensure that the Seawater Intake Pumping Infrastructure is designed and constructed to the highest standards. We are confident that our solution will provide the reliability and longevity required for the Mardie Salt & Potash Project to succeed.

CLOSE
Burgundy Diamond Mine Exploration Plant

West Kimberley, WA

INFO

Client:

Burgundy Diamond Mines

At EIG Australia, we are proud to have been appointed by Burgundy Diamond Mines as the principle contractor to undertake the construction, and commissioning of their new Exploration Plant. Located on the site of the previously operational Ellendale Diamond Mine, this state-of-the-art Stark Resources facility is set to revolutionize small-scale diamond mining. Our team of experts has carried out a range of tasks, including Perth-based plant inspection, electrical and mechanical installations, and plant process commissioning. We are confident that the Exploration Plant, which features a Tomra processing plant, four material conveyors, feed bin, screen, and a water treatment plant, will operate seamlessly and efficiently, delivering exceptional results for Burgundy Diamond Mines for years to come.

CLOSE
Christmas Creek Village, High Voltage Upgrade

Pilbara, Western Australia

INFO

Client:

RED/FMG

EIG safely completed the transition to high voltage services at Christmas Creek Village. The completion of the high voltage upgrade consisted of the installation of two new 33KV substations, together with associated LV works.

CLOSE
Eramurra Village

Karratha, Western Australia

INFO

Client:

Resource Engineer and Design / Citi Pacific

This project consisted of the installation of a 33KV high voltage transformer together with a 1600 amp main site switchboard.

CLOSE
FMG, Karntama Accommodation Village, Backup Power Generation

Pilbara, Western Australia

INFO

Client:

RED/FMG

EIG was contracted to install a new 5000A switch room together with three backup generators. This new facility feeds a high voltage 11KV step-up transformer which provides power to the village in the event of a power outage.

CLOSE
More Mining & Industrial Projects
INFO

Client:

Rio Tinto, Tier 16, Decmil

M1 RES DEV 66KVA Standby Power Generation
Koodaideri Mine Site, Newman WA
Client: Rio Tinto

Nammuldi Fixed Plant Air Manifolds
Nammuldi WA
Client: Tier 16 / Rio Tinto

LV And MEM Workshop Expansion
West Angelas Approx. 100km north of Newman
Client: Decmil / Rio Tinto

SB25 Infrastructural Power Upgrade
West Angelas, Newman WA
Client: Decmil / Rio Tinto

 

 

CLOSE
Northam Eco Lifestyle Village

Northam, WA

INFO

Client:

H&H Developments

EIG completed the supply and installation of all electrical, common street lighting and communications infrastructure for a 270 home subdivision and club houses. This also included solar and water electrical control panels.

CLOSE
Rottnest Island Lighthouse

Rottnest Island, WA

INFO

Client:

Duratec Limited

Constructed in 1896, the Wadjemup Lighthouse on Rottnest Island is heritage-listed critical infrastructure. At approximately 38 metres tall, it is the fourth largest lighthouse in Australia.

EIG delivered a complete upgrade of the lighthouse’s electrical installation, including installing a temporary lantern to ensure that an aid to navigation light remained in operation throughout the entire project. This was a logistically challenging project with stringent quality requirements and a tight budget.

EIG is extremely proud of their team’s work on this unique, iconic project, which will maintain the ongoing safety of ships navigating Gage Roads for many years to come.

CLOSE
Mount Street Footbridge

Perth, WA

INFO

Client:

Fortec Australia / Main Roads WA

EIG were engaged by Fortec, alongside Main Roads WA, to supply and install an automated feature lighting system on the Mount Street footbridge. This enabled Main Roads to remotely initiate a lighting display to suit colours and themes for special events when desired.

The project was unique, providing feature lighting to enhance the bridge above the Kwinana freeway, and was designed with expansion joints, allowing for movement on the bridge.

CLOSE
Kwinana Bulk Terminal

Naval Base, WA

INFO

Client:

Fremantle Port Authority

EIG were involved in the design process to construct a new facility to replace the ageing facilities at the Kwinana Bulk Terminal. EIG installed new lighting, power, data/fibre, fire services including gas suppression system, security systems and access control internally and externally.

EIG scheduled the works in a way which minimised impact on business operations and efficiently integrated new services in conjunction with the current services. No damage or disruption to the existing services was incurred throughout the entire process.

CLOSE
BP Jetty Upgrade – Hazardous Area Building Installation

Naval Base, WA

INFO

Client:

Current Edge Electrical

EIG completed the hazardous area electrical installation within six buildings for BP. This included the supply, installation and commissioning of hazardous area lighting, distribution boards, cable transit frames and earthing systems.

Strict client specifications were prioritised at every level of the installation to ensure the quality, safety and workmanship was of the highest standard to establish a harmonious client handover.

CLOSE
Ingham’s Chicken

Osborne Park, WA

INFO

Client:

Ingham’s Enterprises Pty Ltd

EIG completed a full power upgrade and replaced an ageing transformer at Ingham’s Chicken. EIG installed a new 11KV transformer, 11KV connection, new LV submains and 1600-amp distribution switchboard. The submains comprised of 4 per phase 500mm2 cables on a 900mm cable ladder system. EIG was involved with the engineering and designs which included electrical, structural supports, pits, ground scanning, scaffolding, civil and fencing.

EIG constructed an elaborate cable ladder design which was cohesive with the existing infrastructure and provided the client with capabilities for proposed future expansion and efficient future maintenance.

CLOSE
More Commercial Projects
INFO

Client:

Various

Butcher Street

School Of Early Learning

Nautilus Apartments – Swimming Pool Area Upgrade

Redcliffe Bus Depot

Freo Group Headquarters

Adina HOTEL
100 Hotel Service Apartments / 56 Luxury Residential Apartments / 8 Commercial Tenancies

Helm Apartments
34 Luxury Apartments

Gladstone Street Apartments

Mirrabooka SHS Trade Training Centre
Hospitality Trade Training Centre

Woodvale SHS Trade Training Centre
Hospitality Trade Training Centre

Tambrey Bottle Shop – Celebrations Mega Store

Monet Apartments
13 Luxury Apartments

CLOSE