F44 Fuel Upgrade

Garden Island, WA

INFO

Client:

Australia Defence Force / Duratec Limited

EIG Australia was contracted to carry out a major fuel facility upgrade for F44 aviation fuel (JP-5). This project involved upgrading all fuel pumps, fuel piping, and over-water wharf fuel coping points, in addition to the supply and installation of new tanks.

One of the most complex aspects of the project was the complete new installation of the electrical PLC/SCADA CITEC system. Our team of experts worked diligently to ensure that the new system was installed seamlessly, with minimal disruption to the existing system.

We also installed hundreds of meters of underground piping with cathodic protection to ensure that the entire fuel facility was operating safely and efficiently. The upgrade of high volume filter coalescers was another crucial component of the project that we executed with precision.

Throughout the project, we worked closely with the Australian Defence Force to ensure that all work was completed to their satisfaction. We conducted thorough testing and commissioning of the entire fuel facility to guarantee optimal performance.

Our team of specialists managed to complete the project within the specified timeframe and budget, despite the complexity of the work involved. We were proud to have provided the Australian Defence Force with a fuel facility that meets the highest safety and efficiency standards.

CLOSE
OFI Filter House — Major Diesel Filtration Facility

Garden Island, WA

INFO

Client:

Australian Defence Force / Duratec Limited

EIG delivered the mechanical construction along with the electrical design, and commissioning assurance of a major diesel filtration facility on Garden Island. This facility is capable of filtering 1200L/minute of Diesel fuel and was comprised of two high volume pre-filtration vessels, six high volume coalesces and filtration vessels.

Despite the perceived difficulties that the client foresaw EIG would encounter in delivering the complex and critically important project, EIG completed the project ahead of an already advanced schedule.

CLOSE
RAAF Pearce Electrical Works (CEPS)

Bullsbrook & Gingin, WA

INFO

Client:

Australian Defence Force / Duratec Limited

EIG completed the upgrade of the central emergency power station. This included the installation of a new back-up power station, with HV generators, fuel system, HV panels and control system. All systems were fully integrated into the active site.

EIG were engaged as integration specialists and were able to reduce client costs, allowing budget reallocation to complete further upgrades to systems in other areas.The additional funds allowed for HV cable upgrades as RAAF Pearce and an upgrade to the load bank and a new smart battery backup for the power station at RAAF Gingin.

EIG completed the high-risk work and minimised the impact on site operations, all whilst completing a planned stage cutover into an active site.

CLOSE
Hazardous Areas Compliance

HMAS Stirling, Garden Island WA & RAAF Pearce, Bullsbrook WA

INFO

Client:

Australian Defence Force / Duratec Limited

EIG were engaged to inspect, design and rectify electrical installations across multiple Australian Defence Force sites. This included detailed grade inspections of existing explosion protected equipment within hazardous areas, compilation of inspection reports and surveys noting any non-conformances.

EIG replaced multiple systems including hazardous compliant control systems, fire systems, distribution boards, lighting, power and earthing systems. Hazardous Area Verification Dossiers were then created for all hazardous areas.

Our specialist team were able to quickly adapt to all the individual requirements they were confronted with when working in such niche and high-risk environments.

Working closely together with the client, EIG Australia helped in achieving substantial cost-savings by adjusting both the types of hazardous substances being utilised and how they are stored. These changes resulted in greatly reduced outlay costs, future maintenance expenses, and most importantly the reduced size of the overall hazardous area footprint on the defence bases.

CLOSE
Campbell Barracks Light Vehicle Workshop

Swanbourne, WA

INFO

Client:

Australian Defence Force / Duratec Limited

EIG designed and constructed a complete lubrication facility for the light vehicle workshop at Campbell Barracks. This consisted of the entire design and construction of the mechanical and electrical systems, including code 61 high pressure stainless steel piping for six lubricants and coolants. The hose reel racks were in groups of six on custom built racks in four locations.

EIG designed the custom lubrication dispensing and storage system to the client’s specifications, and installed the system within a sea container module, allowing the client to re-locate the facility to a new location if necessary.

CLOSE
Small Boat Harbour – Mechanical And Electrical Overhaul Of Pumping/Filtration Unit

Garden Island, WA

INFO

Client:

Australian Defence Force / Duratec Limited

EIG completed the electrical and mechanical design and construction of both the mechanical and electrical overhaul of the Moresby Wharf refuelling and filtration facility.

The project consisted of the demolition of the existing facility, and the enhanced design and construction of a new diesel refuelling facility and two large coalesces.

EIG utilised contemporary mechanical equipment and electrical systems. This provided improved safety, advanced instrumentation, and smoother operational procedures.

CLOSE
More Defence Projects
INFO

Client:

Australian Defence Force / Duratec Limited

Pearce Aircraft Control Tower – Lightning Protection & Aircraft Obstacle Lighting
RAAF Pearce, Bullsbrook WA | Client: Australian Defence Force / Duratec Limited

AVCAT Tank Bund Remediation
Garden Island, WA | Client: Australian Defence Force / Duratec Limited

RAAF Gingin Transmitter Building
RAAF Gingin, Gingin WA | Client: Australian Defence Force / Duratec Limited

RCD Compliance
Various Sites, WA | Client: Australian Defence Force / Duratec Limited

Lancelin Firing Point Alpha
Lancelin, WA | Client: Australian Defence Force / Duratec Limited

HMAS Stirling Hardstand
Garden Island, WA | Client: Australian Defence Force / Duratec Limited

Electrical Sewer Upgrades
RAAF Pearce, Bullsbrook WA | Client: Australian Defence Force / Duratec Limited